Backup power
Ensure the continuity of monitoring and control of your facilities during power failures. We help you size the system based on connected load and desired backup time. We install and commission your system.
What we do
A power outage should not leave the control room blind to the process. We calculate the autonomy required for controllers, communications and instruments, and deliver the system installed, tested and documented.
Service scope
- Connected load and backup time calculation
- Sizing and procurement of UPS systems, rectifiers and battery banks
- Installation and commissioning
- Maintenance of existing backup systems
How we do it
1Sizing
Stage completedBackup powerSizing
Inventory of critical loads and the autonomy operations require.
2Installation
- Connected load and backup time c…Verified
- Sizing and procurement of UPS sy…Verified
- Installation and commissioningVerified
Installation
Mounting, wiring and protection of the backup system.
- 39:41CVA-HMI
Station 01
12 signals online
- Tank T-10168 %
- Pump P-101Running
- Valve XV-101Open
- Tank V-20191 %
- PLC-01Online
118
m³/h flow
8.4
bar discharge
Testing
Transfer and autonomy tests before handover.
In the field and in the control room