We migrate obsolete control systems to current platforms without losing the logic or visibility of the process. We installed a Rockwell Automation FactoryTalk DCS at a crude and gas treatment station and migrated PLCs from four manufacturers at crude gathering facilities.
In detail
A control system without spare parts or vendor support puts operational continuity at risk. Migration removes that risk only if it is well planned: a signal inventory, a backup of the existing logic, new graphics that are equivalent or better, and a cutover sequence that keeps shutdowns to a minimum.
In Monagas we supplied and installed the new DCS with its consoles, workstations, HMI and historian servers, cabinets and network. In western Venezuela we migrated and upgraded Siemens, Schneider, Allen-Bradley and GE Fanuc PLCs, along with the fiber optic network, UPS units and radios that connect them.
What’s included
- Signal inventory and backup of the existing logic
- Supply and installation of consoles, workstations, HMI and historian servers
- Cabinets, network equipment and accessories for the new system
- Migration and upgrade of PLCs from several manufacturers
- Development of new supervisory and control graphics
- Alarm and historical data configuration
- Associated fiber optic network, UPS units, rectifiers, radios and antennas
Platforms and manufacturers we work with









How we do it
- 1
Inventory
Signals, loops, logic, graphics and communications of the current system.
- 2
Engineering
New architecture, specifications and cutover sequence to reduce shutdowns.
- 3
Installation
Cabinets, network, servers and consoles; new programming and graphics.
- 4
Cutover and startup
Loop checks, staged cutover and startup with the operations team.
What it looks like in the control room
We design clear screens so operators see process status, alarms and trends in one place.
See SCADA and HMI
In the field and in the control room



Frequently asked questions
Can you migrate without shutting down the whole plant?
It depends on the architecture. The usual approach is a staged or area-by-area cutover that limits shutdowns to short, agreed windows.
Do you work with several brands at once?
Yes. In western Venezuela we migrated Siemens, Schneider, Allen-Bradley and GE Fanuc controllers within the same infrastructure.
Related topics
- Multi-brand PLC programming and integrationProgramming, migration and documentation of Allen-Bradley, Siemens, GE Fanuc, Modicon, ABB and Bristol PLCs and RTUs. Panels, MCCs, drives and HMIs.
- OASyS DNA and OASyS UX SCADA support and administrationOASyS DNA and UX (AVEVA Enterprise SCADA) specialists: administration, backups, displays, communications and maintenance. Experience in 3 countries.
- UPS and battery banks for control systemsLoad and autonomy calculation, supply and installation of UPS units, rectifiers and battery banks for PLCs, radios and instruments. Maintenance included.
Services involved
Have a similar project or fault?
Tell us what system you run and what you need. We will reply with a scope proposal.
Request a quote